Matters needing attention when operating large emulsifying machine


 

WhenLargeEmulsion machineAfter being placed in the customer's manufacturing industrial plant, it is necessary to carry out specific manufacturing. Before the actual operation of the emulsifying machine, first of all, we should master some taboos that should be paid attention to to avoid safety accidents caused by human factors. We can check one by one from the following levels. After the verification, we can carry out the next step of production and manufacturing.

 

The 1. must first be connected to the switching power supply, and the grounding wire of the emulsifying machine must be connected reliably to ensure the safety of power consumption. Otherwise, it is very easy to produce disaster.

 

2., when the switching power supply is connected, everyone will turn the homogenizing head of the emulsifying machine to observe the conversion of the homogenizing head. Looking from top to bottom, rotating in the opposite direction indicates proper wiring. If rotating in the clockwise direction, it indicates that the wiring is reversed and the switching power supply should be connected again.

 

3.large emulsifying machineUnder the condition of no substance, high speed is prohibited to avoid burning, burning rolling bearings and hydraulic seals.

 

In the case of 4. vacuum packaging, we must first fill the water storage tank of the mechanical pump to avoid the high speed of the mechanical pump. When starting the mechanical pump at the first time, check whether the vacuum solenoid valves are closed to avoid steam leakage and insufficient vacuum value.

 

5. before turning off the mechanical pump, turn off the gate valve in front of the mechanical pump to avoid air exposure. When the lid must be raised in Ran Ran, the air filter must be opened first to turn the pot body into superheated steam, and then the actual operation of the elevator will be carried out.

 

It is forbidden to open the 6. mechanical pump without a closed cover. If it is unique, it should not be started for more than three minutes to avoid damage.

 

7., when the raw material must be heated, first of all, to ensure that the emulsifier collet has a heating material, in order to avoid the generation of air burning, damage to the heating tube.

 

8. in actual operationEmulsion machineIn the whole process, if there is a noise, be sure to cut off the power immediately, and then the actual operation can be carried out after the reason is found out.

 

9., in the whole process of the operation of the emulsifying machine, it is forbidden to stretch the body at all positions of the human body to avoid accidents.

 

10. cleaninglarge emulsifying machineIn the case of, be sure to disconnect all switching power supply can be carried out to prevent accidents.

 

 

Matters needing attention when operating large emulsifying machine

WhenLargeEmulsion machineAfter being placed in the customer's manufacturing industrial plant, it is necessary to carry out specific manufacturing. Before the actual operation of the emulsifying machine, first of all, we should master some taboos that should be paid attention to to avoid safety accidents caused by human factors. We can check one by one from the following levels. After the verification, we can carry out the next step of production and manufacturing.

 

The 1. must first be connected to the switching power supply, and the grounding wire of the emulsifying machine must be connected reliably to ensure the safety of power consumption. Otherwise, it is very easy to produce disaster.

 

2., when the switching power supply is connected, everyone will turn the homogenizing head of the emulsifying machine to observe the conversion of the homogenizing head. Looking from top to bottom, rotating in the opposite direction indicates proper wiring. If rotating in the clockwise direction, it indicates that the wiring is reversed and the switching power supply should be connected again.

 

3.large emulsifying machineUnder the condition of no substance, high speed is prohibited to avoid burning, burning rolling bearings and hydraulic seals.

 

In the case of 4. vacuum packaging, we must first fill the water storage tank of the mechanical pump to avoid the high speed of the mechanical pump. When starting the mechanical pump at the first time, check whether the vacuum solenoid valves are closed to avoid steam leakage and insufficient vacuum value.

 

5. before turning off the mechanical pump, turn off the gate valve in front of the mechanical pump to avoid air exposure. When the lid must be raised in Ran Ran, the air filter must be opened first to turn the pot body into superheated steam, and then the actual operation of the elevator will be carried out.

 

It is forbidden to open the 6. mechanical pump without a closed cover. If it is unique, it should not be started for more than three minutes to avoid damage.

 

7., when the raw material must be heated, first of all, to ensure that the emulsifier collet has a heating material, in order to avoid the generation of air burning, damage to the heating tube.

 

8. in actual operationEmulsion machineIn the whole process, if there is a noise, be sure to cut off the power immediately, and then the actual operation can be carried out after the reason is found out.

 

9., in the whole process of the operation of the emulsifying machine, it is forbidden to stretch the body at all positions of the human body to avoid accidents.

 

10. cleaninglarge emulsifying machineIn the case of, be sure to disconnect all switching power supply can be carried out to prevent accidents.