Welcome to Nantong Fleck Fluid Equipment CO., LTD.!
Commissioning and operation of NTFLK equipment before leaving the factory
Every equipment in Nantong Flake will be debugged before leaving the factory.
Flake's equipment will be debugged before leaving the factory, including motor operation, lift, flow rate, mechanical sealing performance, etc., to ensure the normal operation of the equipment before packaging and delivery.
FLECK adopts the global high-quality pre-sales and after-sales service system, specially sets up technical information files for users, tracks the all-round technical quality system for each equipment leaving the factory, and keeps abreast of the actual situation of the equipment in the process of use. to ensure that users really benefit from FLECK's global high-quality service system.
(The picture shows the personnel of CNOOC Tianjin Chemical Research and Design Institute conducting equipment simulation head and simulation flow test in our factory.)
Recommended Information
Crushing pump - pigment crushing test
2023-11-30
Precautions for operating an emulsifier
2023-11-14
Delivery of hygienic rice grinder
2023-11-07
Polyacrylamide mixed homogenization test
2023-10-23

